| Approach to Runway 05, note the ridge to left of short final. |
| "Now I have complete confidence in the RNP technology" Director General Jiang, CAAC Flight Standards.
|
| |
| Problem |
| Solution - Naverus RNP Network: 800 nm of tracks covering approximately 16,100 sq miles of Tibetan terrain.
- Linzhi RNP procedures: 108 waypoints
- Project time from start of design to test: 72 days.
Watch the video that captures highlights from the first flight to Linzhi in July, 2006. That flight was the first true verification of obstacles in Linzhi -and the first tire tracks on the runway by a transport aircraft. Click here for video.
|
| |
| |
|  |
| CAAC, Air China and Naverus pilots and officials celebrating first service. |
| |
|  |
| Tibetans in ceremonial costume commemorating first air service to Linzhi. |
| |
| Technical Details -
Elevation 9670 feet -
Construction Completed: 28 April '06 -
Construction cost: $97 million USD -
First landing by transport aircraft: 12 July '06 -
First revenue service: 01 September '06 -
Linzhi Official Ceremony -
Naverus RNP Network: 800nm of tracks |